Ravine Lake Channel Stabilization Project


This spring, SWWD will undertake a project to stabilize the stream channel to address erosion, create better flow, prevent future erosion, and re-establish native vegetation throughout the stream.

Aerial map of stream

This spring, SWWD will undertake a project to stabilize the stream channel between the Ravine Lake Outlet and Highway 61 in Cottage Grove.

The project will address the erosion that this channel has experienced over the past decade. The project will:

  • Repair erosion
  • Create structures that control flow
  • Prevent future erosion
  • Re-establish native vegetation throughout the stream

To complete this project, tree clearing is necessary. Tree clearing will occur in February 2026, followed by construction later this spring. This project takes place within the Cottage Grove Ravine Regional Park boundary. Visitors to the park should expect minimal impact.

Channel stabilization

The observation of geomorphic changes to the channel and signs of headcutting prompted the project. Headcutting is a form of abrupt, vertical erosion to a streambank.

The use of cross vanes, U-shaped rock barriers that span the width of the stream throughout the stream, will stabilize flow in the channel. Additionally, cross vanes create aquatic habitat and support shoreline vegetation and soil structures.

Past work

The Ravine Park Project began in 2018 to change the entrance and construct a new outlet for Ravine Lake. This addressed seasonal flooding that blocked the only entry and exit to the park.

The new outlet raised the road with a box culvert and added a 1-foot raise of the lake’s normal water level (NWL). It also increased the outlet size, from a 18 inch circular metal pipe outlet to a 6-foot by 8-foot box culvert outlet. The new outlet maintains flow speeds during 2-year, 10-year, and 100-year flooding events.

Eroded sediment with exposed roots
Example of headcutting style erosion

Kyle Axtell

Staff Contact

Questions? Reach out to Kyle Axtell, Planning & Projects Program Manager, at Kyle.Axtell@swwdmn.gov or call 651.728.6124.

Back to top